Mezzanine, Partitioning, Shelving
Client: Name
Date: APR 21
Sectors: Mezzanine Floor
Location: Invergordon
Mezzanine Floor, Partitioning and Shelving solution for world’s largest group of pipeline construction companies in Invergordon.
The Challenge
Core Projects helped create a solution for a dedicated parts storage area with an office for the parts manager situated within the workshop.
The Solution
With space at a premium in the workshop a mezzanine floor solution made use of available height without interfering with needed floor space. Single skin partitioning created a separate parts storage area with shelving, office area and open section with a pallet gate to allow pallets to be dropped on the mezzanine floor level.
94 square metre mezzanine floor
67 bays of shelving with 7 shelf levels per bay
Single skin partitioning
Suspended ceiling
LED lighting
Dado rail with sockets and ether cable connection points
If you're seeking similar solutions or want to discuss how Core Project can assist your business, feel free to reach out. Our team is dedicated to helping you achieve your goals while ensuring maximum efficiency and safety.