Double Deep Racking solution for international company in electrical power and advanced materials in Glasgow.
Core Projects helped this long-standing customer create a storage solution for requirements in a new production facility. 2.4m long rolls of material are delivered into the facility and need to be safely stored before joining the production line. Core Projects solution was a double deep racking system with open timber decking spanning from the front to the rear of the racking creating a solid storage level mitigating point load damage when storing directly on to the beams.
40 storage levels
2.4m long open timber decks
Tunnel bay for access to electrical box
Rack Armour upright protectors on each upright
Rack end barrier to extreme ends
Core Projects are specialists in storage and interior solutions which includes: Pallet Racking, Shelving, Mezzanine Floors, Industrial Partitioning and fully project managed Turn-Key Solutions.
Core Projects (Scotland) Ltd are storage solution specialists with an array of industrial storage solutions which will enhance productivity and increase work flow.
Head Office
Core Projects (Scotland) Ltd.
Suite 5, 110B Maxwell Avenue
Westerton, Glasgow, G61 1HU.
Northern Office
Core Projects (Scotland) Ltd.
8 Holland Place
Aberdeen,
AB25 3UW.
0141 772 9520 GLASGOW
01224 025395 ABERDEEN
sales@coreprojects.co.uk
Online Enquiry Form